User Manual

Optimization Overview continued
SC4812ET BTS Optimization/ATP CDMA LMF
Jan 2002
1-4
Required Documents
The following documents are required to perform optimization of the
cell site equipment:
Site document (generated by Motorola systems engineering), which
includes:
General site information
Floor plans
Power levels
Site PN
Site paging and traffic channel allocation
Board placement
Site wiring lists
Cellsite Data Files (CDF)
Demarcation document (scope of work agreement)
Equipment manuals for non-Motorola test equipment.
Required Documentation
For other information, refer to the following manuals:
Demarcation Document (Scope of Work Agreement)
CDMA LMF Operators Guide; 68P64114A78
CDMA RFDS Hardware Installation manual; 68P64113A93
CDMA RFDS Users Guide
Equipment Manuals for non-Motorola test equipment
SC4812ET Field Replacable Units Guide Motorola part number
68P09253A48
SC 4812ET RF & Power Cabinet Hardware Installation Manual
Motorola part number 68P09253A94
LMF CLI Commands R16.X Motorola part number 68P09253A56
Test Equipment Overview
The LMF is used in conjunction with Motorola recommended test
equipment, and it is a part of a calibrated test set. To ensure consistent,
reliable, and repeatable optimization test results, only recommended test
equipment supported by the LMF must be used to optimize the BTS
equipment. Table 1-1 outlines the supported test equipment that meets the
technical criteria required for BTS optimization.
Table 1-1: CDMA LMF Test Equipment Support Table
Item Description
Hewlett Packard, model
HP 8921A
Cellular communications analyzer (includes
83203B CDMA interface option)
Agilent E4406A Analyzer
with Agilent E4432B
Generator
Used for both IS95A/B and CDMA 2000
testings
. . . continued on next page