User Manual

Prepare to Leave the Site continued
Jan 2002
5-7
SC4812ET BTS Optimization/ATP CDMA LMF
Reestablish OMC-R Control/
Verifying T1/E1
After all activities at the site have been completed,
including disconnecting the LMF, place a phone call to the
OMC-R and request the BTS be placed under control of
the OMC-R.
IMPORTANT
*
5