User Manual

Index continued
SC4812ET BTS Optimization/ATP CDMA LMF
Jan 2002Index-6
RF Adapters, 1-10
RF Attenuators, 1-9
50 Pair Punchblock, H-25
RF Path Bay Level Offset Calibration, 3-73
RF Test Cable, 1-10
RFDS Fault Isolation, 6-20
RFDS Cabling Details, H-22
RFDS calibration
description, 3-96
procedure, 3-96
RFDS FRU, H-14, H-22
RFDS Location, SC 4812ET, 1-23
RFDS parameters, 3-89
checking, 3-89
setting, 3-89
RFDS Test Subscriber Unit, 3-29
RFDS TSU Calibration Channel Frequencies, 3-96
rho test, 4-9
ROM code
described, 3-28
download caution, J-2
downloading, J-1
procedure, J-2
RS232 to GPIB Interface, 1-7
Rubidium Standard Timebase, 3-46
RX, antenna VSWR, test data sheets, A-16
RX and TX paths fail, Troubleshooting, RFDS, 6-20
RX Frame Error Rate (FER) ATP, 4-13
S
SC 4812 BTS Optimization/ATP Test Matrix, B-2
SC 4812ET BTS Combiner, H-8, H-9, H-16, H-17,
H-18, H-19, H-21, H-24
SCLPA, convergence test data sheets, A-7
Selecting Test Equipment, 3-64
Set Antenna Map Data, 3-94
Set RFDS Configuration Data, 3-95
Set Span Parameter Configuration, procedure, 5-4
Setting Cable Loss Values, 3-71
Setting Control Port, 3-5
Setting Coupler Loss Value, 3-72
SGLI2, board detail, MMI port connections, 5-4
SIF, output considerations vs BBX gain set point, C-1
Site, equipage verification, 3-3
Site checklist, verification data sheets, A-2
site equippage, CDF file, 3-2
Span Framing Format
configure, 5-4
verify, 5-3
SPAN I/O Functional Description, Introduction, H-13
Span Line (T1/E1) Verification Equipment, 1-10
Span Line connector , 6-13
Span Parameter Configuration
set, procedure, 5-4
verification, procedure, 5-3
Span Problems no control link, Troubleshooting, 6-29
SPANS LED, 6-25
Spectrum Analyzer, 1-10
Spectrum Analyzer , HP8594E, 3-46
STATUS LED, GLI, 6-25
SYNC Monitor Connector, CSM, 6-24
System Connectivity Test, F-5
T
T1, isolate BTS from the T1 spans, 3-4
Telco Interface Board TIB, 1-29
Test data sheets
Alarm verification, A-16
general optimization checklist, A-4
GPS receiver operation, A-5
initial power tests, A-3
LFR receiver operation, A-6
prepower tests, A-3
preliminary operations, A-2
RX antenna VSWR, A-16
SCLPA convergence, A-7
site checklist, A-2
TX antenna VSWR, A-15
TX BLO, A-8, A-13
verification of test equipment used, A-1
Test equipment, verification data sheets, A-1