User Manual

Index continued
Jan 2002
SC4812ET BTS Optimization/ATP CDMA LMF
Index-5
Optimization, 1-1
optimization/ATP, test setup, 3-55
Advantest R3267/R3562
DRDCs, 3-58
TRDCs, 3-60
Advantest R3465, 3-55
Agilent 8935
DRDCs, 3-57
TRDCs, 3-59
Agilent E4406A/E4432B
DRDCs, 3-57
TRDCs, 3-59
CyberTest, 3-55
HP 8921A, 800 MHz, 3-56
HP 8921A, 1.9 GHz, 3-56
Optimization/ATP Test Matrix, 1-3
Optional Test Equipment, 1-10
Optional test equipment, frequency counter, 1-10
Oscilloscope, 1-10
P
Pilot Time Offset. See PN
Ping, 3-19
PN
offset programming information, E-1
offset usage, E-1
PN offset per sector, E-1
PN Offset Usage , E-1
Power Delta Calibration
Advantest, G-4
HP8921A, G-2
HP8935, G-7
Power Input, 6-13
Power Meter, 1-9
illustration, F-18, I-1
Precalibration, F-18
Power meter
GPIB
Gigatronics 8542B, I-2
HP437B, I-1
illustration, Gigatronics 8542B, I-2
Power Supply Module Interface, 6-13
Precalibration, Power Meter, F-18
Prepower tests, test data sheets, A-3
Preliminary operations
cell Site types, 2-1
test data sheets, A-2
Prepare to Leave the Site
External test equipment removal, 5-1
LMF Removal, 5-6
Reestablish OMCR control, 5-7
Verify T1/E1, 5-7
Prepare to leave the site
reconnect BTS IFM connector, 5-6
reconnect BTS T1 spans, 5-6
Procedures to Copy CAL Files From Diskette to the
CBSC, 6-2, 6-3, 6-4
Product Description, 1-2
Pseudorandom Noise. See PN
ptoff test, 4-10
Punch Block, 3-6
PWR/ALM and ACTIVE LEDs, MCC, 6-27
PWR/ALM LED
BBX2, 6-27
CSM, 6-23
DC/DC Converter, 6-22
generic, 6-22
MCC, 6-27
MPC and EMPC Card, H-20
R
RAM code, described, 3-28
Reconnect BTS IFM connector, 5-6
Reconnect BTS T1 Spans, 5-6
Receive Distribution Card RXDC, 1-29
Reduced ATP, 4-2
Reduced ATP passes but forward link problem
prevails, 6-8
Reestablish OMCR control, 5-7
Removing and Installing LPAs for the SC 4812ET,
H-7
Required documents, 1-4, 1-28
Required Test Equipment
Ethernet LAN transceiver, 1-7
substitute equipment, 1-5
RESET Pushbutton, GLI, 6-26
Resetting BTS modules, 5-1