User Manual

Jan 2002
SC4812ET BTS Optimization/ATP — CDMA LMF
Index-1
Index
Numbers
10BaseT/10Base2 Converter, 1-7
2–way Splitter, 1-11
3–Sector Duplexed Directional Coupler to RFDS
Cabling Table, H-22
4812ET RF Cabinet Internal FRU Locations, H-3
6–Sector Duplexed Directional Coupler to RFDS
Cabling Table, H-23
A
Acceptance Test Procedures ATP , 1-1
Acronyms, 1-11
ACTIVE LED
GLI, 6-25
MCC, 6-27
Advantest R3465, 3-46
GPIB, I-8
Alarm and Span Line Cable Pin/Signal Information,
3-6
ALARM LED, GLI, 6-25
Alarm Monitor window, 3-99
Alarm Reporting Display, 3-99
All Cal/Audit Test, 3-86
All inclusive, TX ATP test outline – CCP shelf 1,
primary, 4-14
All tests fail on a single antenna, Troubleshooting,
RFDS, 6-21
AMR, 1-19
Applying AC Power, 2-5
ATP
generate failure report, 4-14
generate report, 4-14
test matrix/detailed optimization, B-1
ATP – Code Domain Power, 4-11
ATP – Frame Error Rate (FER), 4-13
ATP – Pilot Time Offset, 4-10
ATP – Reduced, 4-2
ATP – Spectral Purity Transmit Mask, 4-7
ATP – Waveform Quality (rho), 4-9
ATP Report, 4-14
ATP Test Procedure, 4-6
B
Basic Troubleshooting Overview, 6-1
Battery Charge Test (Connected Batteries), 2-10
Battery Discharge Test, 2-10
Bay Level offset calibration failure, 6-6
BBX, gain set point vs SIF output considerations, C-1
BBX2, 1-19
BBX2 Connector, 6-14
BBX2 LED Status Combinations, 6-27
Broad Band Receiver. See BBX
BTS
download, 3-28
Ethernet LAN interconnect diagram, 3-19
LMF connection, 3-9, 3-17
system software download, 3-3
BTS Cabinet, 1-27
Create CAL File, 3-87
C
C–CCP Backplane, H-6
C–CCP Backplane Troubleshooting, Procedure, 6-14
C–CCP shelf, 1-19