User Manual

Site Operation Verification
68P09255A57-2
Aug 2002
SC4812ET Optimization/ATP Manual Software Release R16.1.x.x
PRELIMINARY
A-6
General Optimization Checklist
Table A3b: Pre-power Checklist
OK Parameter Specification Comments
LEDs
Frame fans
illuminated
operational
LMF to BTS Connection
Preparing the LMF
Log into the LMF PC
Create site specific BTS directory
Download device loads
per procedure
per procedure
per procedure
per procedure
Ping LAN A
Ping LAN B
per procedure
per procedure
Download/Enable MGLI3s
Download/Enable GLI3s
Set Site Span Configuration
Download CSMs
Enable CSMs
Enable CSMs
Download/Enable MCCs*
Download BBXs*
Download TSU (in RFDS)
Program TSU NAM
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
Test Set Calibration per procedure
*MCCs may be MCC8Es, MCC24s or MCC-1Xs. BBXs may be BBXs or BBX-1Xs
Comments:_________________________________________________________
A