User Manual

Heat Exchanger Power Up68P09255A57-2
Aug 2002
SC4812ET Optimization/ATP Manual Software Release R16.1.x.x
PRELIMINARY
2-13
Heat Exchanger Power Up
Table 2-10: Heat Exchanger Power Up
Step Action
1 Turn the Power Cabinet Heat Exchanger breakers ON (seeFigure 2-6 for breaker location).
2 The Heat Exchanger will now go into a five (5) minute test sequence. Ensure that the internal and
external fans are operating. Place a hand on the internal and external Heat Exchanger grills to feel for
air draft.
Figure 2-6: Heat Exchanger Blower Assembly
Core
Heat Exchanger
Assembly
POWER CABINET
Front View
OUT=OFF
IN=ON
Blower Assembly
Circuit Breaker
FW00181
Side View
Mounting
Bracket
T-30 Screw
Top (Internal) Blower
Fan Module
Blower
Power
Cord
Blower
Power
Cord
Bottom (Ambient) Blower
Fan Module
T-30 Screw
Mounting
Bracket
2