User Manual
Automated Acceptance Test Procedure – Overview – continued
Jan 2002
4-3
SC4812ET BTS Optimization/ATP — CDMA LMF
Full Optimization: Executes the TX calibration, download BLO, and
TX audit before running all of the TX and RX tests.
ATP Test Prerequisites
Before attempting to run any ATP tests, ensure the following:
BTS has been optimized and calibrated (see Chapter 3).
LMF is logged into the BTS.
CSMs, GLI2s, BBXs, MCCs and TSU (if the RFDS is installed)have
correct code load and data load
Primary CSM and GLI2 are INS_ACT
MCCs are INS_ACT.
BBXs are OOS-RAM.
BBXs are calibrated and BLOs are downloaded.
Test cables are calibrated.
Test equipment is selected.
Test equipment is connected for ATP tests.
Test equipment has been warmed up 60 minutes and calibrated.
GPIB is on.
Before the FER is run, be sure that all LPAs are turned
OFF (circuit breakers pulled) or that all transmitter ports
are properly terminated.
All transmit ports must be properly terminated for all ATP
tests.
Failure to observe these warnings may result in bodily
injury or equipment damage.
WARNING
TX/RX OUT Connections
Many of the acceptance test procedures require taking
measurements at the TX OUT (BTS/RFDS) connector. At
sites with RFDS, all measurements are through the RFDS
directional coupler TX OUT connector.
IMPORTANT
*
4