Automated Acceptance Test Procedure Overview continued
SC4812ET BTS Optimization/ATP CDMA LMF
Jan 2002
4-2
Reduced ATP
Equipment has been factorytested for FCC compliance. If
licensegoverning bodies require documentation
supporting SITE compliance with regulations, a full ATP
may be necessary. Perform the Reduced ATP only if
reports for the specific BTS site are NOT required.
NOTE
After downloading the proper operational software to the BTS, the
Cellular Field Engineer (CFE) must perform these procedures (minimal
recommendation):
1 Verify the TX/RX paths by performing TX Calibration, TX Audit
and FER tests.
2 Retrieve Calibration Data required for normal site operation.
Should failures occur while performing the specified tests, refer to the
Basic Troubleshooting section of this manual for help in determining the
failure point. Once the point of failure has been identified and corrected,
refer to the BTS Optimization and ATP Test Matrix section (Table B-1)
to determine the applicable test that must be performed.
In the unlikely event that the BTS passes these tests but has a forward
link problem during normal operation, the CFE should then perform the
additional TX tests for troubleshooting: TX spectral mask, TX rho, and
TX code domain.
Refer to Chapter 3 for detailed information on test set
connections for calibrating equipment, cables and other test
set components, if required.
NOTE
Customer requirements determine which ATP tests to are to be
performed and the field engineer selects the appropriate ATP tests to run.
The tests can be run individually or as one of the following groups:
All TX: TX tests verify the performance of the BTS transmit line up.
These include the GLI2, MCC, BBX, and CIO cards, the LPAs and
passive components including splitters, combiners, bandpass filter,
and RF cables.
All RX: RX tests verify the performance of the BTS receiver line up.
These includes the MPC (for starter frames), EMPC (for expansion
frames), CIO, BBX, MCC, and GLI2 cards and the passive
components including RX filter (starter frame only), and RF cables.
All TX/RX: Executes all the TX and RX tests.