User Manual

Bay Level Offset Calibration continued
Jan 2002
3-93
SC4812ET BTS Optimization/ATP CDMA LMF
TX Audit Test
The Tests menu item, TX Audit, performs the TX BLO Audit test for a
BBX(s). All measurements are made through the appropriate TX output
connector using the calibrated TX cable setup.
Prerequisites
Before running this test, the following should be done:
CSM1,GLI2s, BBXs have correct code load.
Primary CSM and MGLI2 are INS.
All BBXs are OOS_RAM.
Test equipment and test cables are calibrated and connected for TX
BLO calibration.
LMF is logged into the BTS.
Follow the procedure in Table 3-43 to perform the BTS TX Path Audit
test.
3