User Manual

Bay Level Offset Calibration continued
Jan 2002
3-91
SC4812ET BTS Optimization/ATP CDMA LMF
Exception Handling
In the event of a failure, the calibration procedure displays a FAIL
message in the status report window and provides information in the
Description field.
Recheck the test setup and connection and rerun the test. If the tests fail
again, note specifics about the failure, and refer to Chapter 6,
Troubleshooting.
Download BLO Procedure
After a successful TX path calibration, download the BLO calibration
file data to the BBXs. BLO data is extracted from the CAL file for the
BTS and downloaded to the selected BBX devices.
If a successful All Cal/Audit was completed, this
procedure does not need to be performed, as BLO is
downloaded as part of the All Cal/Audit.
NOTE
Prerequisites
Ensure the following prerequisites have been met before proceeding.
BBXs being downloaded are OOSRAM (yellow).
TX calibration is successfully completed.
Follow the steps in Table 3-42 to download the BLO data to the BBXs.
Table 3-42: Download BLO
Step Action
1 Select the BBX(s) to be downloaded.
2 From the Device menu, select Download>BLO.
A status report window displays the result of the download.
NOTE
Selected device(s) do not change color when BLO is downloaded.
3 Click OK to close the status report window.
3