User Manual

Test Equipment Setup continued
SC4812ET BTS Optimization/ATP CDMA LMF
Jan 2002
3-58
CDMA2000 1X/IS95A/Bcapable Test Equipment
Connections
Table 3-29 depicts the interconnection requirements for currently
available test equipment supporting both CDMA 2000 1X and
IS95A/B which meets Motorola standards and is supported by the
LMF.
Table 3-29: CDMA2000 1X/IS95A/B Test Equipment Interconnection
COMMUNICATIONS SYSTEM
ANALYZER ADDITIONAL TEST EQUIPMENT
SIGNAL
Agilent
8935
(Option
200 or
R2K)
Advantest
R3267
Agilent
E4406A
Agilent
E4432
Signal
Gen.
Advantest
R3562
Signal
Generator
Power
Meter
GPIB
Interface LMF
Attenuator
&
Directional
Coupler
BTS
EVEN SECOND
SYNCHRONIZATION
EVEN
SECOND
SYNC IN
EXT TRIG
IN
19.6608 MHZ
CLOCK
EXT REF
IN
MOD TIME
BASE IN
CONTROL
IEEE 488 BUS
10 MHZ
OUT
GPIBHPIB GPIB GPIB
SERIAL
PORT
GPIB GPIB
TX TEST
CABLES
RF
IN/OUT
INPUT
50 W
TX16
20 DB
ATTEN.
BTS
PORT
SYNC
MONITOR
FREQ
MONITOR
HPIB
PATTERN
TRIG IN
EXT REF
IN
RF INPUT
50 W
RX TEST
CABLES
RF OUT
50 W
DUPLEX
OUT
RF OUTPUT
50 W
RX16
10 MHZ
10 MHZ OUT
(SWITCHED)
SYNTHE
REF IN
10 MHZ
IN
TRIGGER
IN
EXT TRIG
SIGNAL SOURCE
CONTROLLED
SERIAL I/O
SERIAL
I/O
SERIAL
I/O
10 MHZ
REF OUT
* WHEN USED ALONE, THE AGILENT 8935 WITH OPTION 200 OR R2K SUPPORTS IS95A/B RX TESTING BUT NOT 1X RX TESTING.
*
3