User's Manual

Index
68P09255A69-3
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
Aug 2002
Index-4
enable, 3-37
system description, 3-40
CSM clock source, select, 3-36
CSM frequency verification, 3-42
CSM LED Status Combinations, 6-28
D
data Folder, 3-13
DC Power Pre-test (BTS Frame), 2-7
DC Power Problems, SCCP Backplane
Troubleshooting, 6-23
DC/DC Converter LED Status Combinations, 6-27
Detailed, optimization/ATP test matrix, B-1
Devices, download. See Download
Digital Control Problems, 6-21
SCCP Backplane Troubleshooting, 6-21
Digital multimeter, required test equipment, 1-9
Directional coupler, required test equipment, 1-9
diversity receive path, definition, 3-78
companion frame, 3-78
stand-alone frame, 3-78
diversity RX path. See diversity receive path
Documents, required, 1-12
Download
See also Devices
BTS, 3-33
BTS system software, 3-3
Download BLO Procedure, 3-89
Download from the CBSC, prepare to leave the site,
5-3
download ROM and RAM code. See ROM code
Download/Enable MCCs, 3-39
Download/Enable MGLIs, 3-35
Duplexer, optional test equipment, 1-10
E
E1, isolate BTS from the E1 spans, 3-14
E4406A
calibration, F-24
setting GPIB address, F-2
E4432B, setting GPIB address, F-3
Enable CSMs. See CSM
End LMF session, 5-4
Equipment Overview, 1-16
Equipment warm-up, 3-54
establish MMI communication, 3-28
Ethernet LAN
interconnect diagram, 3-30
transceiver, 1-7
Ethernet LAN termination, 2-3
Every test fails, Troubleshooting, RFDS, 6-25
F
Failure report generation, 4-27
FER, acceptance test, 4-25
Files, intermediate file, 4-27
files, calibration data, 3-79
Filtronics, low IM Duplexer (Cm035-f2) or
equivalent, optional test equipment, 1-10
Fluke, model 8062A with Y8134 test lead kit, test
equipment, 1-9
Folder Structure Overview, 3-10
Foreword, xviii
forward link problem after passing reduced ATP, 6-14
Frame, equipage preliminary operations, 2-1
FREQ Monitor Connector, CSM, 6-29
Frequency counter, optional test equipment, 1-10
G
Gain set point, C-1
General Safety, xxiii
Generating an ATP Report, 4-27
General optimization checklist, test data sheets, A-4
Gigatronics 8541C, setting GPIB address, F-11
Gigatronics 8542 power meter, calibration, F-27
GLI Connector, 6-19
GLI Ethernet A and B Connections, 6-19
GLI LED Status Combinations, 6-30
GLI Pushbuttons and Connectors, 6-31
GLI2 Front Panel Operating Indicators, 6-31
GPIB, F-13, F-17, F-19
cables, 1-9
HP8935, F-6
interface adapter, switch settings, F-12