User's Manual

Test Equipment Inter-unit Connection, Testing, and Control
68P09255A69-3
Aug 2002
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
F-22
Pretest Setup for Advantest R3465
Before the Advantest R3465 analyzer is used for LMF-controlled testing
it must be set up correctly for automatic testing.
Table F-16: Pretest Setup for Advantest R346
Step Action
1 Press the SHIFT button so the LED next to it is illuminated.
2 Press the RESET button.
Agilent 8932/E4432B Test Equipment Interconnection
To perform FER testing on a 1X BTS with the Agilent 8935, a
1X-capable signal generator, such as the Agilent E4432B, must be used
in conjunction with the CDMA base station test set. For proper
operation, the test equipment items must be interconnected as follows:
10 MHz reference signal - Connect a BNC (M)-BNC (M) cable from
the 8935 10 MHz REF OUT connector to the E4432B 10MHz IN
connector as shown in Figure F-15
Even second pulse reference - Refer to Figure F-15, and connect a
BNC T connector to the 8935 EVEN SEC SYNC IN connector.
Connect a BNC (M)-BNC (M) cable from one side of the BNC T to
the E4432B PATTERN TRIG IN connector. Connect the other side of
the BNC T to the CSM board SYNC MONITOR connector using a
BNC (M)-BNC (M) cable.
Figure F-15: Agilent 8935/E4432B 10MHz Reference and Even Second Tick Connections
ÁÁ
ÁÁ
ÁÁ
ÁÁ
ÁÁ
ÁÁ
Á
Á
Á
Á
Á
Á
Á
Á
E4432B
10 MHz IN
TO GPIB
E4432B
PATTERN TRIG IN
TO CSM BOARD
SYNCH MONITOR
(EVEN SEC TICK)
8935
10 MHz
REF OUT
8935
EVEN SECOND
SYNC IN
WITH BNC T
TDME0011-1
F