User's Manual

Test Equipment Inter-unit Connection, Testing, and Control
68P09255A69-3
Aug 2002
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
F-18
HP 8921A with PCS Interface System Connectivity Test
Follow the steps outlined in Table F-12 to verify that the connections
between the PCS Interface and the HP 8921A are correct and cables are
intact. The software also performs basic functionality checks of each
instrument.
NOTE Table:note. Note 10pt Helvetica
Disconnect other GPIB devices, especially system controllers,
from the system before running the connectivity software.
Table F-12: System Connectivity
Step Action
NOTE
- Perform this procedure after test equipment has been allowed to warm-up and stabilize for a
minimum of 60 minutes.
1 Insert HP 83236A Manual Control/System card into memory card slot.
2 Press the [PRESET] pushbutton.
3 Press the Screen Control [TESTS] pushbutton to display the Tests Main Menu screen.
4 Position the cursor at Select Procedure Location and select it by pressing the cursor control knob. In
the Choices selection box, select Card.
5 Position the cursor at Select Procedure Filename and select it by pressing the cursor control knob. In
the Choices selection box, select SYS_CONN.
6 Position the cursor at RUN TEST and select it. The software will provide operator prompts through
completion of the connectivity setup.
7 Do the following when the test is complete,
position cursor on STOP TEST and select it
OR press the [K5] pushbutton.
8 To return to the main menu, press the [K5] pushbutton.
9 Press the [PRESET] pushbutton.
Pretest Setup for HP 8921A
Before the HP 8921A CDMA analyzer is used for LMF-controlled
testing it must be set up correctly for automatic testing.
Table F-13: Pretest Setup for HP 8921A
Step Action
1 Unplug the memory card if it is plugged in.
2 Press the CURSOR CONTROL knob.
3 Position the cursor at IO CONFIG (under To Screen and More) and select it.
4 Select Mode and set for Talk&Lstn.
F