User's Manual
Optimization (Pre–ATP) Data Sheets – continued
PRELIMINARY
1X SCt4812ET Lite BTS Optimization/ATP
08/01/2001
A-2
Site Checklist
Table A-2: Site Checklist
OK Parameter Specification Comments
- Deliveries Per established procedures
- Floor Plan Verified
-
-
-
Inter Frame Cables:
Ethernet
Frame Ground
Power
Per procedure
Per procedure
Per procedure
-
-
-
Factory Data:
BBX2
Test Panel
RFDS
Per procedure
Per procedure
Per procedure
- Site Temperature
- Dress Covers/Brackets
Preliminary Operations
Table A-3: Preliminary Operations
OK Parameter Specification Comments
- Frame ID DIP Switches Per site equipage
- Ethernet LAN verification Verified per procedure
Comments:_________________________________________________________
A