Power Removal Procedure
If it becomes necessary to remove power from the frame, follow the
procedure in Table 2-9.
Table 2-9: Power Removal
Step Action
1 Set all DC PDA circuit breakers to OFF (pulled out) in the following sequence:
LPAs
Pilot beacon
Heat exchanger
ETIB
Options
PS1 and PS2
MAIN BREAKER #1 (Internal)
2
n WARNING
The surge capacitors in the DC PDA will store a large electrical charge for long periods of time.
Failure to discharge these capacitors as specified in this step could result in serious personal injury or
damage to equipment.
On the DC PDA, set the PS1 and PS2 circuit breakers to ON (pushed in), and wait at least 30
seconds.
3 Set the DC PDA PS1 and PS2 circuit breakers to OFF.
4 Set the MAP power switch to OFF.
5 Set all ACLC circuit breakers to OFF (down) in the following sequence:
GFI
HEATER
RECT. 1/3
RECT. 2/4
MAIN
6 Set the facility circuit breaker controlling external power to the frame to OFF.