User's Manual

Initial Power Up continued
PRELIMINARY
1X SCt4812ET Lite BTS Optimization/ATP
08/01/2001
2-12
Figure 2-8: ACLC Voltage Measurement Probe Points International
G = Ground
N = Neutral
L1 = Line 1
GN
L1
(ACLC front panel assembly
removed.)
Applying AC Power
Once the external AC power connections are verified, AC power may be
applied internally to the frame. Table 2-5 provides the procedure for
applying internal AC power.
Table 2-5: Applying Internal AC Power
Step Action
1 Be sure the requirements of Table 2-4 for AC input power connection verification have been met.
2 Be sure all DC PDA circuit breakers are set to OFF (pulled out), all ACLC frontpanel circuit
breakers are OFF (down), and all battery shelf circuit breakers are OFF (pulled out).
. . . continued on next page