When to Optimize
PRELIMINARY
1X SCt4812ET Lite BTS Optimization/ATP
08/01/2001
1-4
New Installations
After the initial site installation, the BTS must be prepared for operation.
This preparation includes verifying hardware installation, initial
powerup, downloading of operating code, verifying GPS operation and
verifying transmit and receive paths.
Next, the optimization is performed. Optimization includes performance
verification and calibration of all transmit and receive RF paths, and
download of accumulated calibration data.
A calibration audit of all RF transmit paths may be performed any time
after optimization to verify BTS calibration.
After optimization, a series of manual preAcceptance Test Procedure
(ATP) verification tests are performed to verify alarm/redundancy
performance.
After manual preATP verification tests, a series of ATPs are performed
to verify BTS performance. An ATP is also required before the site can
be placed in service.
Site Expansion
Optimization is also required after expansion of a site with additional,
interconnected BTS frames.
Periodic Optimization
Periodic optimization of a site may also be required, depending on the
requirements of the overall system.
Repaired Sites
Refer to Appendix B for a detailed FRU Optimization/ATP
Test Matrix outlining the minimum tests that must be
performed any time a BTS subassembly or RF cable
associated with it is replaced.