Optimization Manual Scope and Layout continued
PRELIMINARY
1X SCt4812ET Lite BTS Optimization/ATP
08/01/2001
1-2
Document Composition
This document covers the following major areas:
S Introduction, consisting of preliminary background information (such
as component and subassembly locations and frame layouts) to be
considered by the Cellular Field Engineer (CFE) before performing
optimization or tests.
S Preliminary Operations, consisting of jumper configuration of BTS
subassemblies, prepowerup tests, initial application of power to
the BTS equipment frames, and initial powerup tests.
S Optimization/Calibration, consisting of procedures for downloading
all BTS processor boards, test equipment setup, RF path verification,
BLO calibration and calibration audit, and Radio Frequency
Diagnostic System (RFDS) calibration.
S Acceptance Test Procedures (ATP), consisting of automated ATP tests,
executed by the CDMA LMF, and used to verify all major TX and RX
performance characteristics on all BTS equipment. This chapter also
covers generating an ATP report.
S Prepare to Leave the Site, discussing site turnover after ATP is
completed.
S Basic Troubleshooting, consisting of procedures to perform when an
ATP fails, as well as when incorrect results are obtained during logon,
test equipment operation, calibration, and GPS operation.
S Appendices that contain pertinent PN offset, frequency programming,
and output power data tables, along with additional data sheets that are
filled out manually by the CFE at the site.