User's Manual
Optimization Manual Scope and Layout
08/01/2001
1-1
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Manual Scope and Layout
This document provides information pertaining to the optimization and
audit tests of the Motorola SC4812ET Lite RF Base Transceiver Station
(BTS) equipment frame and its associated internal and external
interfaces. The following subjects are addressed: preliminary background
information; optimization, and alarm/redundancy tests; Acceptance Test
Procedures (ATP) to verify site operation and regulation compliance; site
turnover; troubleshooting.
Most applications use the same test procedure for all equipment
variations. However, decision break points are provided throughout the
procedure when equipment–specific tests are required. For example,
when tests using external test equipment are performed instead of those
using the RFDS, additional test procedures and illustrations are provided
to cover both applications.
This optimization procedure consists of a group of task-oriented tests.
Each major test category (Audit, Initial power–up, Calibration tests, etc.)
is described in chapters which are broken down into multi-page “maps.”
Each “map” typically consists of pages containing all the information
necessary to perform the test (including all required input levels, output
levels, CDMA Local Maintenance Facility (CDMA LMF) commands,
and test points required). Also described are some of the main concepts
you must understand in the test process. Whenever possible, graphics,
flowcharts, or other examples complement the information/steps.
Assumptions and Prerequisites
This document assumes that the BTS frames and cabling have been
installed per the Frame Mounting Guide Analog/CDMA/TDMA;
68P09226A18, which covers the physical “bolt down” of all SC series
equipment frames, and the SC4812ET Lite Installation; 68P09253A36,
which covers BTS–specific cabling configurations.
1