User's Manual

RFDS Set-up and Calibration68P09255A69-3
Aug 2002
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
3-101
Program TSU NAM
The NAM must be programmed before it can receive and process test
calls, or be used for any type of RFDS test.
Prerequisites
MGLI is INS_ACT (bright green).
SUA is powered up and has a code load.
Follow the procedure in Table 3-52 to program the TSU NAM.
Table 3-52: Program NAM Procedure
Step Action
1 In the LMF, select the RFDS tab.
2 Select the SUA by clicking on it.
3 Click on TSU in the BTS menu bar, and select Program TSU NAM from the pull-down menu.
- A NAM programming window will appear.
4 Enter the appropriate information in the boxes (see Table 3-46 and Table 3-47) .
5 Click on the OK button to display the status report.
6 Click on the OK button to close the status report window.
3