User's Manual

CSM System Time - GPS & LFR/HSO Verification68P09255A69-3
Aug 2002
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
3-47
Table 3-25: LORAN-C Initialization/Verification
Step NoteAction
2 Verify the following LFR information (highlighted above in boldface type):
- Locate the dot that indicates the current phase locked station assignment (assigned by MM).
- Verify that the station call letters are as specified in site documentation as well as M X Y Z
assignment.
- Verify the S/N ratio of the phase locked station is greater than 8.
3 At the CSM> prompt, enter sources <cr> to display the current status of the the LORAN receiver.
- Observe the following typical response.
Num Source Name Type TO Good Status Last Phase Target Phase Valid
----------------------------------------------------------------------------
0 Local GPS Primary 4 Yes Good -3 0 Yes
1 LFR ch A Secondary 4 Yes
Good -2013177 -2013177 Yes
2 Not used
Current reference source number: 1
*NOTE Timed-out should only be displayed while the LFR is warming up. Not-Present or
Faulty should not be displayed. If the LFR does not appear as one of the sources, then configure the
LFR as a back-up source by entering the following command at the CSM> prompt:
ss 1 2
4
LORAN LFR information (highlighted above in boldface type) is usually the #1 reference source
(verified from left to right).
* IMPORTANT
If any of the above mentioned areas fail, verify:
- The LFR antenna is not obstructed or misaligned.
- The antenna pre-amplifier power and calibration twisted pair connections are intact and < 91.4 m
(300 ft) in length.
- A dependable connection to suitable Earth Ground is in place.
- The search list and PLL station for cellsite location are correctly configured .
NOTE
LFR functionality should be verified using the source command (as shown in Step 3). Use the
underlined
responses on the LFR row to validate correct LFR operation.
5 Close the HyperTerminal window.
3