User's Manual

Initial Power-up68P09255A69-3
Aug 2002
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
2-13
Figure 2-8: ACLC Voltage Measurement Probe Points - International
G = Ground
N = Neutral
L1 = Line 1
GN
L1
(ACLC front panel assembly
removed.)
Applying AC Power
Once the external AC power connections are verified, AC power may be
applied internally to the frame. Table 2-5 provides the procedure for
applying internal AC power.
Table 2-5: Applying Internal AC Power
Step Action
1 Be sure the requirements of Table 2-4 for AC input power connection verification have been met.
2 Be sure all DC PDA circuit breakers are set to OFF (pulled out), all ACLC front-panel circuit
breakers are OFF (down), and all battery shelf circuit breakers are OFF (pulled out).
3 Be sure the MAP power switch, TCP switch, and BATT TEST switch are all set to OFF.
. . . continued on next page