User's Manual
Preliminary Operations: Overview
68P09255A69-3
Aug 2002
1X SC4812ET Lite BTS Optimization/ATP Software Release 2.16.1.x
PRELIMINARY
2-2
Preliminary Operations: Overview
Introduction
This section first verifies proper frame equipage against the site-specific
documentation supplied for each BTS application.. This includes
verifying module placement, jumper, and dual in-line package (DIP)
switch settings. Next, pre-power up and initial power-up procedures are
presented. Finally, power-down and normal power-up procedures are
covered.
Cell-site Types
Sites are configured as 3-sector with one or two carriers. Each type has
unique characteristics and must be optimized accordingly.
Configuration Data File
The Configuration Data File (CDF), also called Cell-site Data File,
contains site type and equipage data information. The LMF application
program reads data directly from the CDF during optimization. The
number of BTS frames, number and types of BBX and MCC boards, and
linear power amplifier assignments are some of the equipage data
included in the CDF.
Site Equipage Verification
Review the site documentation. Match the site engineering equipage data
to the actual boards and modules shipped to the site. Physically inspect
and verify the equipment provided for the frame.
CAUTION
Always wear an approved anti-static wrist strap while handling
any circuit card/module to prevent damage by ESD. After
removal, the card/module should be placed on a conductive
surface or back into the anti-static packaging in which it was
shipped.
Initial Installation of Boards/Modules
Table 2-1: Initial Installation of Boards/Modules
Step Action
1 Refer to the site documentation and, if it was not previously done, slide all boards and modules into
the appropriate shelves as required. DO NOT SEAT the boards and modules at this time.
2 As the actual site hardware is installed, record the serial number of each module on a “Serial Number
Checklist” in the site logbook.
2