User's Manual
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Foreword
- FCC Requirements
- General Safety
- Revision History
- Patent Notification
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
- Optimization/Calibration - Introduction
- Isolate Span Lines/Connect LMF
- Preparing the LMF
- Using CDMA LMF
- Download the BTS
- CSM System Time/GPS and LFR/HSO Verification
- Test Equipment Set-up
- Test Set Calibration
- Bay Level Offset Calibration
- RFDS Set-up and Calibration
- BTS Redundancy/Alarm Testing
- BTS Alarms Testing
- Preliminary Operations: Overview
- Pre-Power-up Tests
- Initial Power-up Tests
- Chapter 4 Automated Acceptance Test Procedure
- Automated Acceptance Test Procedures - All-inclusive TX & RX
- TX Output Acceptance Tests: Introduction
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX Frame Error Rate (FER) Acceptance Test
- Generate an ATP Report
- Chapter 5 Prepare to Leave the Site
- Chapter 6 Basic Troubleshooting
- Basic Troubleshooting Overview
- Troubleshooting: Installation
- Troubleshooting: Download
- Troubleshooting: Calibration
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Check-list
- C-CCP Backplane Troubleshooting
- Module Front Panel LED Indicators and Connectors
- Basic Troubleshooting - Span Control Link
- Appendix A Data Sheets
- Appendix B PN Offset/I & Q Offset Register Programming Information
- Appendix C FRU Optimization/ATP Test Matrix
- Appendix D BBX Gain Set Point vs. BTS Output
- Appendix E CDMA Operating Frequency
- Appendix F PCS Interface Setup for Manual Testing
- Appendix G VSWR
- Appendix H Download ROM Code
- Appendix I In-Service Calibration
- Appendix J GPIB Addresses
- Introduction
- HP437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- Motorola CyberTest GPIB Address
- HP8935 Test Set GPIB Address
- Setting HP8921A and HP83236A/B GPIB Address
- Advantest R3465 GPIB Address
- RS232 GPIB Interface Box
- Advantest R3267 Spectrum Analyzer GPIB Address
- Agilent E4406A Transmitter Tester GPIB Address
- Index
Index
68P09255A61-4
FIELD TRIAL
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
Index-9
Troubleshooting
BBX2 Control Good - No (or Missing) Span Line
Traffic, 6-16
BLO Calibration Failure, 6-6
C-CCP Backplane, 6-13, 6-14
Calibration Audit Failure, 6-7
Code Domain Power and Noise Floor Measurement
Failure, 6-9
Code Download Failure, 6-4
Communications Analyzer Communication Failure,
6-3
CSM Checklist, 6-11
Data Download Failure, 6-4
DC Power Problems, 6-18
Device Enable (INS) Failure, 6-5
Login Failure, 6-2
MGLI2 Control Good - No Control over AMR,
6-16
MGLI2 Control Good - No Control over
Co-located GLI2, 6-15
Miscellaneous Failures, 6-5
Multi-FER Failure, 6-10
No BBX2 Control in the Shelf - No Control over
Co-located GLI2s, 6-16
No DC Input Voltage to any C-CCP Shelf Module,
6-19
No DC Input Voltage to Power Supply Module,
6-18
No GLI2 Control through Span Line Connection,
6-15
No GLI2 Control via LMF, 6-15
No MCC24 Channel Elements, 6-17
Power Meter Communication Failure, 6-2
Rho and Pilot Time Offset Measurement Failure,
6-8
Set span configuration, 6-30
span problems, 6-28
TX and RX Signal Routing, 6-19
TX Mask Measurement Failure, 6-8
TSU NAM
Parameters, 3-83
Program, 3-87
TX, antenna VSWR, test data sheets, A-16
TX & RX Path Calibration, 3-68
TX and RX Frequency vs Channel
1700 MHz, E-7
1900 MHz, E-2
800 MHz, E-4
TX and RX Signal Routing, C-CCP Backplane
Troubleshooting, 6-19
TX Audit Test, 3-76
TX BLO, test data sheets
Offset/Power Output Verification, A-9
Power Output Verification, A-14
TX Mask test, 4-7
TX Mask Verification, spectrum analyzer display,
illustration, 4-8
TX OUT connection, 4-3
TX Output Acceptance Tests
Code domain power, 4-6, 4-11
introduction, 4-6
Pilot Time Offset, 4-6, 4-10
Spectral purity TX mask, 4-6
Waveform quality (rho), 4-6, 4-9
TX Path, calibration, 3-69
TX path, 1-5
audit, 3-76
calibration, 3-72
U
Updating LMF Files, 5-7
UTP, LMF to BTS connection, 3-5
V
Verification of Test Equipment, data sheets, A-1
Verify Span Parameter Configuration, procedure, 5-4
Voltage Standing Wave Ratio. See VSWR
VSWR
Advantest Test Set, G-4
Calculation, G-3, G-5
Equation, G-3, G-5
manual test setup detail
Advantest illustration, G-6
HP illustration, G-3, G-4
required test equipment, G-1
transmit and receive antenna, G-1
W
Walsh channels, 4-11