User's Manual
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Foreword
- FCC Requirements
- General Safety
- Revision History
- Patent Notification
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
- Optimization/Calibration - Introduction
- Isolate Span Lines/Connect LMF
- Preparing the LMF
- Using CDMA LMF
- Download the BTS
- CSM System Time/GPS and LFR/HSO Verification
- Test Equipment Set-up
- Test Set Calibration
- Bay Level Offset Calibration
- RFDS Set-up and Calibration
- BTS Redundancy/Alarm Testing
- BTS Alarms Testing
- Preliminary Operations: Overview
- Pre-Power-up Tests
- Initial Power-up Tests
- Chapter 4 Automated Acceptance Test Procedure
- Automated Acceptance Test Procedures - All-inclusive TX & RX
- TX Output Acceptance Tests: Introduction
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX Frame Error Rate (FER) Acceptance Test
- Generate an ATP Report
- Chapter 5 Prepare to Leave the Site
- Chapter 6 Basic Troubleshooting
- Basic Troubleshooting Overview
- Troubleshooting: Installation
- Troubleshooting: Download
- Troubleshooting: Calibration
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Check-list
- C-CCP Backplane Troubleshooting
- Module Front Panel LED Indicators and Connectors
- Basic Troubleshooting - Span Control Link
- Appendix A Data Sheets
- Appendix B PN Offset/I & Q Offset Register Programming Information
- Appendix C FRU Optimization/ATP Test Matrix
- Appendix D BBX Gain Set Point vs. BTS Output
- Appendix E CDMA Operating Frequency
- Appendix F PCS Interface Setup for Manual Testing
- Appendix G VSWR
- Appendix H Download ROM Code
- Appendix I In-Service Calibration
- Appendix J GPIB Addresses
- Introduction
- HP437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- Motorola CyberTest GPIB Address
- HP8935 Test Set GPIB Address
- Setting HP8921A and HP83236A/B GPIB Address
- Advantest R3465 GPIB Address
- RS232 GPIB Interface Box
- Advantest R3267 Spectrum Analyzer GPIB Address
- Agilent E4406A Transmitter Tester GPIB Address
- Index
Index
68P09255A61-4
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
Aug 2002
Index-8
rho test, 4-9
ROM Code, Download, H-1
RS-232 to GPIB Interface, 1-10
RX, antenna VSWR, test data sheets, A-17
RX Acceptance Tests, Frame Error Rate, 4-6
RX path, 1-4
S
Sector Configuration, 1-30
Set Antenna Map Data, 3-84
Set Span Parameter Configuration, procedure, 5-5
Setting Cable Loss Values, 3-66
Setting TX Coupler Loss Value, 3-67
SGLI2, board detail, MMI port connections, 5-5
Shelf Configuration Switch, 2-3
Signal Generator, 3-63, 3-64
Site, equipage verification, 3-3
Site checklist, data sheets, A-2
Site equipage, CDF file, 3-2
Site I/O board, T1 span cable connection, 5-3
Site Serial Number Check List, A-18
Span Framing Format
configure, 5-5
verify, 5-4
Span I/O board
E1 span isolation, illustration, 3-5
T1 span isolation, illustration, 3-5
Span Line
connector , 6-13
T1/E1 Verification Equipment, 1-13
Span line, troubleshooting, 6-28
Span line configuration, troubleshooting, 6-30
Span line traffic, No or missing, 6-16
Span Parameter Configuration
set, procedure, 5-5
verification, procedure, 5-4
SPANS LED, GLI2, 6-23
Spectral Purity Transmit Mask ATP, 4-7
Spectral Purity TX Mask, 4-6
Spectrum Analyzer, 1-12, 3-63, 3-64
Spectrum Analyzer , HP8594E, 3-44
STATUS LED, GLI2, 6-23
SYNC Monitor Connector, CSM, 6-22
System Connectivity Test, HP8921A, F-2
T
T1
isolate BTS from the T1 spans, 3-4
span connection, 5-3
Test data sheets
AMR CDI Alarm Input Verification, A-17
BTS redundancy/alarm tests, A-16
general optimization checklist, A-4
GPS receiver operation, A-5
initial power tests, A-3
LFR receiver operation, A-6
LPA
convergence, A-8
IM Reduction, A-7
pre-power tests, A-3
preliminary operations, A-2
RX antenna VSWR, A-17
site checklist, A-2
TX antenna VSWR, A-16
TX BLO
Offset/Power Output Verification, A-9
Power Output Verification, A-14
Test Equipment
Automatically Selecting, 3-59
Calibrating, 3-60
Connecting test equipment to the BTS, 3-43
Manually Selecting, 3-58
Reference Chart, 3-45
Selecting, 3-57
verification data sheets, A-1
VSWR, G-1
Test Equipment Setup, 3-43
GPS & LFR/HSO, 3-33
HP PCS Interface, F-7
RF path calibration, 3-72
Test Matrix, C-3
ATP optimization, C-2
Test Set, Calibration, 3-57
Timing Reference Cables, 1-11
Top Interconnect Plate, 1-21