User's Manual
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Foreword
- FCC Requirements
- General Safety
- Revision History
- Patent Notification
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
- Optimization/Calibration - Introduction
- Isolate Span Lines/Connect LMF
- Preparing the LMF
- Using CDMA LMF
- Download the BTS
- CSM System Time/GPS and LFR/HSO Verification
- Test Equipment Set-up
- Test Set Calibration
- Bay Level Offset Calibration
- RFDS Set-up and Calibration
- BTS Redundancy/Alarm Testing
- BTS Alarms Testing
- Preliminary Operations: Overview
- Pre-Power-up Tests
- Initial Power-up Tests
- Chapter 4 Automated Acceptance Test Procedure
- Automated Acceptance Test Procedures - All-inclusive TX & RX
- TX Output Acceptance Tests: Introduction
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX Frame Error Rate (FER) Acceptance Test
- Generate an ATP Report
- Chapter 5 Prepare to Leave the Site
- Chapter 6 Basic Troubleshooting
- Basic Troubleshooting Overview
- Troubleshooting: Installation
- Troubleshooting: Download
- Troubleshooting: Calibration
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Check-list
- C-CCP Backplane Troubleshooting
- Module Front Panel LED Indicators and Connectors
- Basic Troubleshooting - Span Control Link
- Appendix A Data Sheets
- Appendix B PN Offset/I & Q Offset Register Programming Information
- Appendix C FRU Optimization/ATP Test Matrix
- Appendix D BBX Gain Set Point vs. BTS Output
- Appendix E CDMA Operating Frequency
- Appendix F PCS Interface Setup for Manual Testing
- Appendix G VSWR
- Appendix H Download ROM Code
- Appendix I In-Service Calibration
- Appendix J GPIB Addresses
- Introduction
- HP437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- Motorola CyberTest GPIB Address
- HP8935 Test Set GPIB Address
- Setting HP8921A and HP83236A/B GPIB Address
- Advantest R3465 GPIB Address
- RS232 GPIB Interface Box
- Advantest R3267 Spectrum Analyzer GPIB Address
- Agilent E4406A Transmitter Tester GPIB Address
- Index
Index
68P09255A61-4
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
Aug 2002
Index-6
LED Status, 6-20
BBX2, 6-26
CSM, 6-21
DC/DC Converter, 6-20
GLI2, 6-22
LPA, 6-27
MCC, 6-26
LFR
Initialization / Verification, 3-39
receiver operation, test data sheets, A-6
redundancy/alarm tests, 3-94
LFR/HSO, Test Equipment Setup, 3-33
Line Build Out parameters
configure, 5-5
verify, 5-4
LMF, 1-8, 3-7
Ethernet maintenance connector interface detail,
illustration, 3-6
Installation and Update Procedures, 3-8
Termination and Removal, 5-8
to BTS connection, 3-5
LMF Operation, 3-16
LMF Removal, 5-8
Loading Code, 3-24
Logging In to a BTS, 3-18
Logging Out, 3-21
CLI, 3-22
GUI, 3-21
Logical BTS, 1-15
Numbering, 1-16
Login
CLI, 3-20
GUI, 3-18
Login Failure, Troubleshooting, 6-2
Low Frequency Receiver, 3-32
LPA
redundancy test, 3-97
test data sheets
convergence, A-8
IM Reduction, A-7
LPA Module LED, 6-27
LPAs, Site Serial Number Check List, A-19
M
Manual
layout, 1-1
overview, 1-2
MASTER LED, GLI2, 6-22
MCC, Enable, 3-30
MGLI, redundancy test RFM frame, 3-98
MGLI2
board detail, MMI port connections, 5-5
Download, 3-25
Miscellaneous errors, Troubleshooting, 6-5
MMI Connection, 3-23
MMI Connector
CSM, 6-22
GLI2, 6-23
MCC, 6-26
MMI equipment setup, 3-23
MMI Interface Kit, 1-10
Module status indicators, 6-20
Multi-FER test Failure, Troubleshooting, 6-10
N
NAM, Valid Ranges, 3-84
No DC input voltage to Power Supply Module, 6-18
No DC voltage +5 +65 or +15 Volts to a specific
GLI2 BBX2 or Switch board, 6-19
No GPS Reference Source, 6-11
Non-MGLI2, Download, 3-26
Null Modem Cable, 3-33
O
Online Help, 1-3
Optimization
Process, 3-1
purpose, 1-4
When, 1-5
Optional Test Equipment, 1-12
frequency counter, 1-12
Oscilloscope, 1-13
P
PA Shelves, 1-22