User's Manual

Table Of Contents
Index
68P09255A61-4
FIELD TRIAL
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
Index-5
Gigatronics Power Meter, 3-43
GLI. See Master (MGLI2) and Slave (SGLI2) Group
Line Interface
GLI2
Connector, 6-14
Ethernet Connections, 6-14
LED Status, 6-22
No Control through span line connection, 6-15
No Control via LMF, 6-15
GPIB
Advantest R3465, J-7
HP83236A/B, J-5
HP8921A, J-5
HP8935, J-4
power meter
Gigatronics 8542B, J-2
HP437B, J-1
set address, Motorola CyberTest, J-3
GPIB Cable, 1-11
GPS
Initialization/Verification, 3-35
receiver operation, test data sheets, A-5
redundancy alarm tests, 3-94
satellite system, 3-29
Test Equipment Setup, 3-33
GPS Bad RX Message Type, 6-11
Graphical User Interface, 1-3, 3-16
GUI, 1-3, 3-16
Graphical User Interface, 3-16
Logging Out, 3-21
H
LMF Hardware Requirements, 1-9
High Stability 10 MHz Rubidium Standard, 1-13
High Stability Oscillator, 3-32
High-impedance Conductive Wrist Strap, 1-12
HP 437B, 3-43
HP 83236 A, F-3
HP 83236A, F-2
HP 8921, 3-43
HP 8921A, System Connectivity Test, F-2
HP 8935, 3-43
HP PCS Interface Test Equipment Setup for Manual
Testing, F-7
HP Test Set, VSWR, G-2
HP83236A/B, GPIB, J-5
HP8921A, GPIB, J-5
HP8935, GPIB, J-4
HSO
Initialization/Verification, 3-41
redundancy/alarm tests, 3-94
HyperTerminal Connection, Creating, 3-10
I
I and Q values, B-1
In-Service Calibration, I-15
Initial Installation of Boards/Modules, preliminary
operations, 2-2
Initial power tests, test data sheets, A-3
Initial power-up
BTS frame, 2-14
RFDS, 2-14
Initialization/Verification
GPS, 3-35
HSO, 3-41
LFR, 3-39
Intended reader profile, 1-14
Inter-frame cabling, when to optimize, C-2
IS-97 specification, B-1
ISB connectors, 6-13
Isolation, T1/E1 Span, 3-4
Itasca Alarms Test Box, 1-13
L
LAN
BTS frame interconnect, illustration, 3-13
Tester, 1-12
LAN Connectors, GLI2, 6-23
LED, CSM, 3-32