User's Manual
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Foreword
- FCC Requirements
- General Safety
- Revision History
- Patent Notification
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
- Optimization/Calibration - Introduction
- Isolate Span Lines/Connect LMF
- Preparing the LMF
- Using CDMA LMF
- Download the BTS
- CSM System Time/GPS and LFR/HSO Verification
- Test Equipment Set-up
- Test Set Calibration
- Bay Level Offset Calibration
- RFDS Set-up and Calibration
- BTS Redundancy/Alarm Testing
- BTS Alarms Testing
- Preliminary Operations: Overview
- Pre-Power-up Tests
- Initial Power-up Tests
- Chapter 4 Automated Acceptance Test Procedure
- Automated Acceptance Test Procedures - All-inclusive TX & RX
- TX Output Acceptance Tests: Introduction
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX Frame Error Rate (FER) Acceptance Test
- Generate an ATP Report
- Chapter 5 Prepare to Leave the Site
- Chapter 6 Basic Troubleshooting
- Basic Troubleshooting Overview
- Troubleshooting: Installation
- Troubleshooting: Download
- Troubleshooting: Calibration
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Check-list
- C-CCP Backplane Troubleshooting
- Module Front Panel LED Indicators and Connectors
- Basic Troubleshooting - Span Control Link
- Appendix A Data Sheets
- Appendix B PN Offset/I & Q Offset Register Programming Information
- Appendix C FRU Optimization/ATP Test Matrix
- Appendix D BBX Gain Set Point vs. BTS Output
- Appendix E CDMA Operating Frequency
- Appendix F PCS Interface Setup for Manual Testing
- Appendix G VSWR
- Appendix H Download ROM Code
- Appendix I In-Service Calibration
- Appendix J GPIB Addresses
- Introduction
- HP437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- Motorola CyberTest GPIB Address
- HP8935 Test Set GPIB Address
- Setting HP8921A and HP83236A/B GPIB Address
- Advantest R3465 GPIB Address
- RS232 GPIB Interface Box
- Advantest R3267 Spectrum Analyzer GPIB Address
- Agilent E4406A Transmitter Tester GPIB Address
- Index
Index
68P09255A61-4
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
Aug 2002
Index-2
Numbers
10BaseT/10Base2 Converter, 1-10
LMF to BTS connection, 3-5
1700 MHz Center Frequencies, Calculating, E-7
1700 MHz PCS Channels, E-6
1900 MHz Center Frequencies, Calculating, E-2
1900 MHz PCS Channels, E-1
2-way Splitter, 1-13
3C-PC-COMBO CBL, 1-10
800 MHz CDMA Channels, E-4
800 MHz Center Frequencies, Calculating, E-4
A
Abbreviations and Acronyms, 1-6
ACTIVE LED
GLI2, 6-22
MCC, 6-26
Advantest R3465, 3-43
Calibrating Test Cable, F-8
GPIB, J-7
Agilent E4406A, calibration, 3-61
Alarm Connector Location/Pin Numbering SC
4850/4850E, 3-100
ALARM LED, GLI2, 6-22
Alarm Monitor window, 3-99
alarm redundancy tests, BBX2, 3-93
Alarm Reporting Display, 3-99
Alarm tests, redundancy, 3-88
Alarm/Redundancy Tests, Distribution Shelf, 3-91
All Cal/Audit Test, 3-77, 3-78
All RX, 4-2
All TX, 4-2
All TX/RX, 4-2
AMR, No control, 6-16
AMR CDI Alarm Input Verification, test data sheets,
A-17
Ancillary Equipment Frame identification, 1-15
Ancillary frame, when to optimize, C-1
Antenna Map, 3-84
ATP, 4-1
Code Domain Power, 4-11
Frame Error Rate (FER), 4-13
generate report, 4-14
Pilot Time Offset, 4-10
Report, 4-14
Spectral Purity Transmit Mask, 4-7
test matrix/detailed optimization, C-2
Test Prerequisites, 4-3
Test Procedure, 4-4
testing options, 4-4
Waveform Quality (rho), 4-9
Automated Acceptance Test Procedure, 4-1
B
Backplane DIP switch settings, 2-3
Bay Level Offset calibration failure, 6-6
BBX2
alarm redundancy tests, 3-93
Connector, 6-14
gain set point vs BTS output considerations, D-1
No control in the shelf, 6-16
BLO
Calibration, 3-68
Calibration Audit, 3-76
calibration data file, 3-69
Calibration Failure, 6-6
Download, 3-75
BTS
Ethernet LAN interconnect diagram, 3-13
LMF connection, 3-5
system software download, 3-3
test data sheets, redundancy/alarm tests, A-16
when to optimize, C-1
BTS frame
DC Distribution Pre-test, 2-9
DC Power Pre-test, 2-7
initial power-up, 2-14
Create CAL File, 3-79
C
C-CCP Backplane, Troubleshooting, 6-13, 6-14