User's Manual
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Foreword
- FCC Requirements
- General Safety
- Revision History
- Patent Notification
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
- Optimization/Calibration - Introduction
- Isolate Span Lines/Connect LMF
- Preparing the LMF
- Using CDMA LMF
- Download the BTS
- CSM System Time/GPS and LFR/HSO Verification
- Test Equipment Set-up
- Test Set Calibration
- Bay Level Offset Calibration
- RFDS Set-up and Calibration
- BTS Redundancy/Alarm Testing
- BTS Alarms Testing
- Preliminary Operations: Overview
- Pre-Power-up Tests
- Initial Power-up Tests
- Chapter 4 Automated Acceptance Test Procedure
- Automated Acceptance Test Procedures - All-inclusive TX & RX
- TX Output Acceptance Tests: Introduction
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX Frame Error Rate (FER) Acceptance Test
- Generate an ATP Report
- Chapter 5 Prepare to Leave the Site
- Chapter 6 Basic Troubleshooting
- Basic Troubleshooting Overview
- Troubleshooting: Installation
- Troubleshooting: Download
- Troubleshooting: Calibration
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Check-list
- C-CCP Backplane Troubleshooting
- Module Front Panel LED Indicators and Connectors
- Basic Troubleshooting - Span Control Link
- Appendix A Data Sheets
- Appendix B PN Offset/I & Q Offset Register Programming Information
- Appendix C FRU Optimization/ATP Test Matrix
- Appendix D BBX Gain Set Point vs. BTS Output
- Appendix E CDMA Operating Frequency
- Appendix F PCS Interface Setup for Manual Testing
- Appendix G VSWR
- Appendix H Download ROM Code
- Appendix I In-Service Calibration
- Appendix J GPIB Addresses
- Introduction
- HP437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- Motorola CyberTest GPIB Address
- HP8935 Test Set GPIB Address
- Setting HP8921A and HP83236A/B GPIB Address
- Advantest R3465 GPIB Address
- RS232 GPIB Interface Box
- Advantest R3267 Spectrum Analyzer GPIB Address
- Agilent E4406A Transmitter Tester GPIB Address
- Index
FRU Optimization/ATP Test Matrix68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
C-5
Table C-3: SC 4812T BTS Optimization and ATP Test Matrix
Doc
Tbl
#
RFDS
Switch Card
Power Supply Modules**
LPA Bandpass Filter
LPA
LPA Trunking Backplane
GLI
GPS
LFR/HSO
CSM
MCC
BBX
C-CCP Backplane
CIO
MPC/EMPC
TX Cables
RX Cables
RX Filter
Directional Coupler (TX)
Directional Coupler (RX)
Description
page
OPTIMIZATION AND TEST LEGEND
Required
*
Perform if necessary for additional fault isolation, repair assurance, or site certification.
**
Replace power converters one card at a time so that power to the C-CCP or LPA shelf is not lost. If
power to the C-CCP shelf is lost, all cards in the shelf must be downloaded again.
1
Perform on all carrier and sector TX paths to the C-CCP cage.
2
Perform on all carrier and sector RX paths to the C-CCP cage.
3
Perform on all primary and redundant TX paths of the affected carrier.
4
Perform on the affected carrier and sector TX paths. (BBXR replacement affects all carrier and
sector TX paths.)
5
Perform on the affected carrier and sector RX paths. (BBXR replacement affects all carrier and
sector RX paths.)
6
Perform on all RF paths of the affected carrier and sector (RFDS replacement affects all carriers.)
7
Perform with redundant BBX for all sectors on all carriers.
8
Verify performance by performing on one sector of one carrier only.