User's Manual

Table Of Contents
FRU Optimization/ATP Test Matrix68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
C-5
Table C-3: SC 4812T BTS Optimization and ATP Test Matrix
Doc
Tbl
#
RFDS
Switch Card
Power Supply Modules**
LPA Bandpass Filter
LPA
LPA Trunking Backplane
GLI
GPS
LFR/HSO
CSM
MCC
BBX
C-CCP Backplane
CIO
MPC/EMPC
TX Cables
RX Cables
RX Filter
Directional Coupler (TX)
Directional Coupler (RX)
Description
page
OPTIMIZATION AND TEST LEGEND
Required
*
Perform if necessary for additional fault isolation, repair assurance, or site certification.
**
Replace power converters one card at a time so that power to the C-CCP or LPA shelf is not lost. If
power to the C-CCP shelf is lost, all cards in the shelf must be downloaded again.
1
Perform on all carrier and sector TX paths to the C-CCP cage.
2
Perform on all carrier and sector RX paths to the C-CCP cage.
3
Perform on all primary and redundant TX paths of the affected carrier.
4
Perform on the affected carrier and sector TX paths. (BBXR replacement affects all carrier and
sector TX paths.)
5
Perform on the affected carrier and sector RX paths. (BBXR replacement affects all carrier and
sector RX paths.)
6
Perform on all RF paths of the affected carrier and sector (RFDS replacement affects all carriers.)
7
Perform with redundant BBX for all sectors on all carriers.
8
Verify performance by performing on one sector of one carrier only.
C