User's Manual
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Foreword
- FCC Requirements
- General Safety
- Revision History
- Patent Notification
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
- Optimization/Calibration - Introduction
- Isolate Span Lines/Connect LMF
- Preparing the LMF
- Using CDMA LMF
- Download the BTS
- CSM System Time/GPS and LFR/HSO Verification
- Test Equipment Set-up
- Test Set Calibration
- Bay Level Offset Calibration
- RFDS Set-up and Calibration
- BTS Redundancy/Alarm Testing
- BTS Alarms Testing
- Preliminary Operations: Overview
- Pre-Power-up Tests
- Initial Power-up Tests
- Chapter 4 Automated Acceptance Test Procedure
- Automated Acceptance Test Procedures - All-inclusive TX & RX
- TX Output Acceptance Tests: Introduction
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX Frame Error Rate (FER) Acceptance Test
- Generate an ATP Report
- Chapter 5 Prepare to Leave the Site
- Chapter 6 Basic Troubleshooting
- Basic Troubleshooting Overview
- Troubleshooting: Installation
- Troubleshooting: Download
- Troubleshooting: Calibration
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Check-list
- C-CCP Backplane Troubleshooting
- Module Front Panel LED Indicators and Connectors
- Basic Troubleshooting - Span Control Link
- Appendix A Data Sheets
- Appendix B PN Offset/I & Q Offset Register Programming Information
- Appendix C FRU Optimization/ATP Test Matrix
- Appendix D BBX Gain Set Point vs. BTS Output
- Appendix E CDMA Operating Frequency
- Appendix F PCS Interface Setup for Manual Testing
- Appendix G VSWR
- Appendix H Download ROM Code
- Appendix I In-Service Calibration
- Appendix J GPIB Addresses
- Introduction
- HP437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- Motorola CyberTest GPIB Address
- HP8935 Test Set GPIB Address
- Setting HP8921A and HP83236A/B GPIB Address
- Advantest R3465 GPIB Address
- RS232 GPIB Interface Box
- Advantest R3267 Spectrum Analyzer GPIB Address
- Agilent E4406A Transmitter Tester GPIB Address
- Index
FRU Optimization/ATP Test Matrix
68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
C-4
Table C-3: SC 4812T BTS Optimization and ATP Test Matrix
Doc
Tbl
#
page
Description
Directional Coupler (RX)
Directional Coupler (TX)
RX Filter
RX Cables
TX Cables
MPC/EMPC
CIO
C-CCP Backplane
BBX
MCC
CSM
LFR/HSO
GPS
GLI
LPA Trunking Backplane
LPA
LPA Bandpass Filter
Power Supply Modules**
Switch Card
RFDS
Table 2-1 2-3
Initial Boards/Modules Install,
Preliminary Operations, CDF
Site Equipage; etc.
Table 2-2
Table 2-5
2-6
2-14
DC Power Pre-Test Physical
Inspect
Table 2-7 2-15
Initial Power-up
Table 3-6 3-14
Ping the Processors
Table 3-12 3-26
Download/Enable MGLIs
Table 3-12 3-26
Download/Enable GLIs
Table 3-13 3-27
Download CSMs
Table 3-13 3-27
Download MCCs
Table 3-13 3-27
Download BBXs
Table 3-15 3-29
Enable CSMs
Table 3-16 3-30
Enable MCCs
Table 3-19 3-36
GPS Initialization / Verification
Table 3-20 3-40
LFR Initialization / Verification
Table 3-21
3-42
HSO Initialization/Verification
Table 3-36 3-74
TX Path Calibration 4 4 4
1 1
4
* 3 3
4
7
Table 3-37 3-76
Download Offsets to BBX
4 4 1 4 *
Table 3-38 3-77
TX Path Calibration Audit 4
4 4 1 1 4 * 3 3 4 7
Table 3-46 3-88
RFDS Calibration Procedure 6 6
5
4
5 1 1
6
* 3 3
4
6
Table 4-1 4-5
Spectral Purity TX Mask ATP 4 4
1
4
* * * * *
Table 4-1 4-5
Waveform Quality (rho) ATP 4 4
* 1
4
* * * * * *
Table 4-1 4-5
Pilot Time Offset ATP 4 4
* 1
4
* * * * * *
Table 4-1 4-5
Code Domain Power / Noise
Floor
4 4
1
4
8 8 8 8 * * * *
Table 4-1 4-5
FER Test
5 5 5 5 2 2 5 8 8 8 8 * 7
C