User's Manual

Table Of Contents
Optimization (Pre-ATP) Data Sheets68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
A-5
General Optimization Checklist
Table A-5: Pre-power Checklist
OK Parameter Specification Comments
LEDs
Frame fans
illuminated
operational
LMF to BTS Connection
Preparing the LMF
Log into the LMF PC
Create site specific BTS directory
Create master-bts-cdma directory
Download device loads
Moving/Linking files
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
Ping LAN A
Ping LAN B
per procedure
per procedure
Download/Enable MGLIs
Download/Enable GLIs
Set Site Span Configuration
Download CSMs
Download
Enable CSMs
Download/Enable MCCs
Download BBXs
Download TSU (in RFDS)
Program TSU NAM
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
Test Set Calibration per procedure
Comments:_________________________________________________________
A