User's Manual

Table Of Contents
Optimization (Pre-ATP) Data Sheets
68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
A-4
Pre-Power and Initial Power Tests
Table A-4: Pre-power Checklist
OK Parameter Specification Comments
Pre-power-up tests Verify power supply
output voltage at the top
of each BTS frame is
within specifications
Internal Cables:
ISB (all cages)
CSM (all cages)
Power (all cages)
Ethernet Connectors
LAN A ohms
LAN B ohms
LAN A shield
LAN B shield
Ethernet Boots
verified
verified
verified
verified
verified
isolated
isolated
installed
Air Impedance Cage (single cage) installed
Initial power-up tests Verify power supply
output voltage at the top
of each BTS frame is
within specifications:
Comments:_________________________________________________________
A