Prepare to Leave the Site
68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
5-6
Figure 5-2: MGLI2/GLI2 MMI Port Connection
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
Á
Á
Á
Á
Á
Á
Á
Á
FW00344
9-PIN TO 9- PIN
RS-232 CABLE
NULL MODEM BOARD
(PART# 8484877P01)
RS-232 CABLE
FROM LMF COM1
PORT
MMI SERIAL PORT
GLI BOARD
Set BTS Site Span Configuration
Perform the procedure in Table 5-5 to configure the Span Framing
Format and Line Build Out (LBO) parameters. ALL MGLI2/GLI2
boards in all C-CCP shelves that terminate a T1/E1 span must be
configured.
NOTE
Perform the following procedure ONLY if span configurations
loaded in the MGLI2/GLI2s do not match those in the
OMCR/CBSC data base, AND ONLY when the exact
configuration data is available. Loading incorrect span
configuration data will render the site inoperable.
Table 5-5: Set BTS Span Parameter Configuration
Step Action
1 If not already done, connect a serial cable from the LMF COM1 port (via null modem board) to the
front panel of the MGLI2 MMI port (see Figure 5-2).
2 Start an MMI communication session with CSM-1 by using the Windows desktop shortcut icon (see
Table 3-5 on page 3-11).
NOTE
The LMF program must not be running when a Hyperterminal session is started if COM1 is being
used for the MMI session.
. . . continued on next page
5