User's Manual

Table Of Contents
Bay Level Offset Calibration68P09255A61-4
Aug 2002
1X SC 4812T BTS Optimization/ATP Software Release 2.16.1.x
FIELD TRIAL
3-75
Table 3-36: BTS TX Path Calibration
ActionStep
6 From the Test Pattern pick list, select a test pattern.
NOTE
Selecting Pilot (default) performs tests using a pilot signal only.
Selecting Standard performs tests using pilot, synch, paging and six traffic channels. This
requires an MCC to be selected.
Selecting CDFPilot performs tests using a pilot signal, however, the gain for the channel
elements is specified in the CDF file.
Selecting CDF performs tests using pilot, synch, paging and six traffic channels, however, the
gain for the channel elements is specified in the CDF file.
7 Click on OK.
8 Follow the cable connection directions as they are displayed.
A status report window displays the test results.
9 Click on Save Results or Dismiss to close the status report window.
Exception Handling
In the event of a failure, the calibration procedure displays a FAIL
message in the status report window and provides information in the
Description field.
Recheck the test setup and connection and re-run the test. If the tests fail
again, note specifics about the failure, and refer to Chapter 6,
Troubleshooting.
3