Equipment Warm-up
NOTE
Warm-up BTS equipment for a minimum of 60 minutes prior to
performing the BTS optimization procedure. This assures BTS
site stability and contributes to optimization accuracy. (Time
spent running initial power-up, hardware/firmware audit, and
BTS download counts as warm-up time.)
Calibrating Cables
Figure 3-10 and Figure 3-11 show the cable calibration setup for various
supported test sets. The left side of the diagram depicts the location of
the input and output ports of each test set, and the right side details the
set up for each test.
WARNING
Before installing any test equipment directly to any BTS TX
OUT connector, verify there are NO CDMA BBX channels
keyed. At active sites, have the OMC-R/CBSC place the antenna
(sector) assigned to the LPA under test OOS. Failure to do so can
result in serious personal injury and/or equipment damage.