Objective
The objective of this procedure is to attach the Site I/O junction box to
the unit. The location for the Site I/O junction box is shown in
Figure 6-9.
If you do not mount a Site I/O Junction box to a unit, leave the installed
Site I/O caps on the Site I/O Junction box connectors.
Required Tools and Materials
The following tools and materials are necessary to do this procedure:
Torque driver wrench, 1/4–in. hex female drive, 0–10 N–M
T30 Torx tamper bit
Site I/O Junction box
Procedure to Attach the Site
I/O Junction Box to the Unit
Follow the procedure below to attach the site I/O junction box to the
unit.
Table 6-7: Procedure to Attach the Site I/O Junction Box to the Unit
Step Action
1 Use a T30 TORX bit to remove Site I/O Cap from the Site I/O connector.
NOTE
Save Site I/O Cap for future use.
2 Remove the Site I/O Plate from the Site I/O Junction Box.
3 Attach the straight end of the Y–ground cable (cable L) or the Site I/O ground cable (cable B) to
the site I/O junction box. Use one M6x19 tamper–resistant screw. Torque to 5.0 N–m.
NOTE
The free end of the Site I/O junction box cable should be connected to the customer–supplied Site
I/O interface.
4 The free end of the Site I/O junction box cable should be connected to the customer–supplied Site
I/O interface or to the Primary Surge Suppressor.
5 Position the Site I/O junction box as shown in Figure 6-9.
6 Insert the Site I/O junction box on to the housing, using the alignment feature on the housing.
7 Use a T30 Torx tamper bit to tighten (but do not torque) the upper tamper resistant screw.
8 Tighten but do not torque the lower tamper resistant screw.
9 Use a T30 Torx tamper bit to torque the upper and lower screw to 5 N–m.