User's Manual

Site I/O, Span Line, RGPS, and Modem Cabling for Sites Equipped With
Primary Surge Suppressor
continued
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
5-20
Pin and Signal Information for
Surge Suppressor Punchdown
Block Cabling
Table 5-14 gives the pin and signal information for connecting the loose
wires to the customer locations on the Punchdown Block.
The CPE half of the punchdown block connectors comes
shipped prewired and complete. The user only needs to
wire the OSP half of the punchdown block connectors.
NOTE
Table 5-14: Pin/Signal Information for Site I/O Cable and Punchdown Block
BTS Interface Punchblock
Location
Description
OSP 1T Customer Input 1 Signal
OSP 1R Customer Input 1 Ground
OSP 2T Customer Input 2 Signal
OSP 2R Customer Input 2 Ground
OSP 3T Customer Input 3 Signal
OSP 3R Customer Input 3 Ground
OSP 4T Customer Input 4 Signal
OSP 4R Customer Input 4 Ground
Customer Input
OSP 5T Customer Input 5 Signal
OSP 5R Customer Input 5 Ground
OSP 6T Customer Input 6 Signal
OSP 6R Customer Input 6 Ground
OSP 7T Customer Input 7 Signal
OSP 7R Customer Input 7 Ground
OSP 8T Customer Input 8 Signal*
OSP 8R Customer Input 8 Ground*
OSP 9T Data to Tail
OSP 9R Data to Tail +
Sync Reverse
OSP 10T Data from Tail
OSP 10R Data from Tail +
. . . continued on next page
5