User's Manual

Site I/O, Span Line, RGPS, and Modem Cabling for Sites Equipped With
Primary Surge Suppressor
continued
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
5-18
Procedure to Install Site I/O
Cable Between Site I/O
Junction Box and Optional
Primary Surge Suppressor
Do the procedure in Table 5-13 to connect the Site I/O cable. Refer to
Figure 5-14, Figure 5-15 and Figure 5-16.
Table 5-13: Procedure to Install Site I/O Cable Between Site I/O Junction Box and Optional Primary Surge
Suppressor
Step Action
1 Route the Site I/O cable(s) from the unit location to the Primary Surge Suppressor.
2 Connect the Site I/O cable from unit 1 to the connector labeled SITE I/O 1 on the right side of the
Surge Suppressor.
3 Connect the appropriate conductors or wires to the Primary Surge Suppressor Punchdown block.
Figure 5-14: Site I/O Cabling Details with Primary Surge Suppressor
PRIMARY
SURGE
SUPPRESSOR
SITE I/O
JUNCTION
BOX
SITE I/O
CABLE
AC
POWER
T
ANTENNA
D
MASTER
GROUND
Y
MICROCELL 1
CUSTOMER
INPUTS
SPAN
RGPS
PHONE
(MODEM)
M
N
O
V
SITE I/O
INTERFACE
1IN CONDUIT
(FOR CABLES O, N,
M, AND V)
1IN CONDUIT
5