User's Manual
Power, Ground, and Battery Cabling for Sites Equipped with Optional
Primary Surge Suppressor
– continued
JAN 2002
5-11
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Table 5-6: Procedure to Install the Earth Ground Cable on a BTS Equipped with Optional Primary Surge
Suppressor
Step Action
1 Route cable A (ground cable) from the ground lug on the unit mounting bracket to the Primary
Surge Suppressor location.
2 Connect cable A to the GND connector 1–4 on the Primary Surge Suppressor.
Table 5-7: Procedure to Install the AC Input Cable(s) on a BTS Equipped with Optional Primary Surge
Suppressor
Step Action
1 Connect the customer–supplied AC input power cable (cable T) to the customer defined AC
power source. Refer to Table 5-3 for wiring information.
2 Verify all connections of cable T with an ohmmeter prior to routing the cable.
3 Route cable T via 1–in. conduit from the customer defined AC power source to the breaker
terminals inside the Primary Surge Suppressor. Refer to Figure 5-8.
4 Place the round, black connector on the AC input power cable (cable S) onto the appropriate
Carrier 1–4 AC Output connector on the Primary Surge Suppressor.
5 Route the AC input power cable (cable S – Motorola part number 3087854C02) from the Primary
Surge Suppressor to the unit location(s).
Table 5-8: Procedure to Install the DC Input Cable(s) on a BTS Equipped with Optional Primary Surge
Suppressor
Step Action
1 Connect the loose wires of the DC Input Cable (cable U) to the customer defined DC power
source. Refer to Table 5-4 for wiring information.
2 Verify all connections of cable U with an ohmmeter prior to routing the cable.
3 Route cable U from the DC power supply to the unit location.
5