Installation Completion Checklist
JAN 2002
6-43
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Directions
Fill out the installation completion checklist and make any necessary
copies. You may copy this check sheet as needed.
Installation Completion
Checklist
Date Hardware Installation Completed: ________________________
Site:___________________________________________________
Serial Number(s):_________________________________________
______________________________________________________
Checklist Completed By:____________________________________
Checklist Reviewed By:_____________________________________
Table 6-35: Installation Completion Checklist
Status No. Item Notes
1 Air flow clearance requirements are met.
2 Equipment is not damaged.
3 Mounting bracket is level and secure.
4 Back solar cover (if applicable) is securely
attached to the mounting bracket.
5 RGPS head and mast are secure.
6 RGPS head has a clear view of the sky and is
not in a location which accumulates debris.
Make sure the RGPS is located away from
the BTS transmit antenna.
7 Mounting bracket is connected to the Master
ground.
8 The connection to the AC source is secure (if
applicable).
9 The AC source is protected by a lightning
arrestor (if applicable).
10 The connection to the DC source is secure (if
applicable).
11 The connection to the battery is secure (if
applicable).
12 The connection to the auxiliary device is
secure (if applicable).
13 The antenna connections are secure.
. . . continued on next page