Table 6-34: Procedure to Power on the Surge Suppressor, the Unit, and Mount the Solar Cover
Step Action
2 If not applying AC power, go to step 6. If applying AC power, push the main AC power breaker
on the Surge Suppressor to the On position. Refer to Figure 6-30.
3 Push the AC power breakers for each individual carrier to the On position. All unused power
breakers must be in the Off position.
4 Close the Primary Surge Suppressor door. Use the tamperresistant key to turn the locks
clockwise to the Locked position.
5 Push down on the AC power breaker on the unit until it clicks and remains down. The white
collar on the breaker is not visible when the breaker is closed.
6 If not applying DC power or providing for battery backup, go to step 7. If applying DC power or
have short or long duration batteries present, push down on the DC power breaker until it clicks
and remains down. The white collar on the breaker is not visible when the breaker is closed.
7 Position the solar cover so the cooling vents are at the top and place the solar cover on the unit.
Use the tamperresistant key to tighten the four screws (two on each side) to 2.2 NM. Refer to
Figure 6-31.
Figure 6-29: Lock Positions on Primary Surge Suppressor
LATCHED POSITION
UNLATCHED POSITION