User's Manual
Generate an ATP Report
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
7-88
Background
Each time an ATP test is run, an ATP report is updated to include the
results of the most recent ATP tests if the Save Results button is used
to close the status report window. The ATP report will not be updated if
the status reports window is closed with use of the Dismiss button.
ATP Report
A separate report is created for each BTS and includes the following for
each test:
Test name
PASS or FAIL
Description information (if applicable)
MAWI number
Channel number
Carrier number
Sector number
Upper test limit
Lower test limit
Test result
Time stamp
Details/Warning information (if applicable)
Procedure to Run ATP Report
Follow the procedures in Table 7-48 to view and create a printable file
for the ATP report of a BTS.
Table 7-48: Procedure to Generate an ATP Report
Step Action
1 Click on the Login tab if it is not in the forefront.
2 Select the desired BTS from the Available Base Stations pick list.
3 Click on the Report button.
4 Start the report if desired by clicking on a column heading.
5 Click on the Dismiss button if you do not want to create a printable file copy.
6 To create a printable file, select the desired file type in the picklist and then click on the Save
button.
Refer to the LMF help screens, or the CDMA LMF
Operator’s Guide, 68P64114A21, for information on how
to print an ATP report.
NOTE
7