User's Manual

Power Meter Calibration
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
7-60
Objective
This procedure calibrates the power meter that will be used for cable
calibration and BTS testing.
Prerequisites
The following are prerequisites for power meter calibration:
1. The power meter is connected. Refer to Figure 7-16 in the Test
Equipment Selection procedure.
2. Test equipment has been selected.
Procedure to Calibrate the
Power Meter
Follow the steps in Table 7-38 to calibrate the power meter.
Table 7-38: Procedure to Calibrate the Power Meter
Step Action
1 Click on Util>Calibrate Test Equipment. A cable connection direction popup is displayed.
2 Follow the directions provided.
3 Click on the OK button to close the status results window.