User's Manual

Test Equipment Selection
JAN 2002
7-57
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Objective
The objective of this procedure is to select the test equipment used for
BTS testing. The LMF must select the test equipment before it is used
for BTS testing.
Prerequisites
The following are prerequisites for test equipment selection:
1. Test equipment to be used has been connected as shown in
Figure 7-16.
2. Power for the test equipment and GPIB box has been turned on.
3. LMF has been started (do not have to be logged in to the BTS).
Procedure to Select Test
Equipment
Follow the steps in Table 7-35 for test equipment selection
The test equipment can also be selected via a manual or
automatic connection. Refer to the CDMA LMF
Operators Guide, 68P64114A78 for the procedures.
NOTE
Table 7-35: Procedure to Select Test Equipment
Step Action
1 Select Tools>Options from the menu. A LMF Options window appears.
2 Select the correct COM port from the Comm Port pick list (normally COM1).
3 Click on the AutoDetection button if it is not enabled.
4 If the GPIB addresses are not displayed, enter the GPIB addresses in the box labeled GPIB
addresses to search.
NOTE
When both a power meter and a communication test set are selected, the first item listed in the
GPIB addresses to search box will be used for RF power measurements, e.g., TX calibration and
audit. The address for a power meter is 13 and the address for a communications test set is 18.
The numbers 13 and 18 must be included in the GPIB address to search box so the power meter
(13) will be used for TX calibration and audit.
5 Click on the Apply button. The button will darken until the selection has been committed. A
check mark will appear in the Manual Configuration section for detected test equipment items.
6 Click on the Dismiss button to close the LMF Options window.
7