User's Manual

Test Equipment Calibration continued
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
7-56
Procedure to Setup Advantest
R3267 Test Equipment
Table 7-34: Procedure to Setup Advantest R3267 Test Equipment
Step Action
1 If you have not already done so, interface the CDMA LMF computer to the BTS and login to the BTS.
2 Perform the following steps for the manual test procedure for Automated TX verification.
Set up the communication test set by inserting the Automatic TX test PCMCIA card into the
Advantest PCMCIA card reader slot A. (software revision 0.0.0.4 or later).
Perform the following steps to access and use the Advantest Automatic TX test screen:
3 Press the Remote LCL button (located below the CRT).
4 Press the Loader ON button (located below the CRT).
5 Select LOAD on the CRT screen (button #6).
6 Use the DISPLAY CONTROL knob to select the REMOTE.BAS file, then press the knob.
7 Select RUN on the CRT screen (button #1).
8 Wait for *Idle Free space to appear at the bottom of the CRT.
9 Refer to Figure 7-34 to set up test equipment.
Verify that the coaxial cable from the appropriate TX connector on the BTS is connected to the test
equipment RF input port via the in line 30 dB high power attenuator for MicroCell BTSs.
7