User's Manual

Connect Test Equipment to BTS continued
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
7-12
Advantest R3465
front panel
Advantest R3465
rear panel
BNC
T
CONNECTIONS DEPICTED BY HEAVY BOLD LINES ARE
STATIONARY AND SHOULD REMAIN INSTALLED DURING
TEST EQUIPMENT TRANSPORT FROM SITE TO SITE.
19.6608 MHZ REFERENCE
2 SECOND REFERENCE
GPIB
CONNECTOR
FROM EVEN
SEC/SYNC IN
Figure 7-11: Communications Test Set Timing Signal Detail (Advantest R3465)
BTS DIAGNOSTIC ACCESS AREA
7