User's Manual
Required Documents
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
1-10
Required Documents
The following documents are required to perform the installation, ATP
and FRU procedures of the cell site equipment:
SC300 BTS Hardware Installation, ATP and FRU – 68P09224A55
(This manual)
Grounding Guidelines for Cellular Radio Installations –
68P81150E62.
CDMA LMF Operator’s Guide – 68P64114A78.
Site Document (generated by Motorola Systems Engineering), which
includes:
– site specific documentation
– channel allocation
– contact list (customer)
– ancillary/expendable equipment list
– site wiring lists
– contact list (Motorola support)
– job box inventory
Demarcation Document (Scope of Work agreement)
Installation manuals for non-Motorola equipment (for reference
purposes).
1