User's Manual Part 3
08/01/2001
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Index-1
Index
Numbers
10 MHz Rubidium Standard, optional test equipment,
1-11
10BaseT/10Base2 converter
LMF to BTS connection, 3-21
remove from BTS, 5-4
2–way splitter, optional test equipment, 1-10
50–pair punchblock, 3-18
A
Abbreviated
RX acceptance test, all–inclusive, 4-4
TX acceptance test, all–inclusive, 4-4
Acceptance Test Procedure. See ATP
ACTIVE LED
GLI, 6-31
MCC, 6-33
Alarm and Span Line Cable Pin/Signal Information,
3-18
ALARM LED, GLI, 6-31
Alarm Monitor window, 3-86
Alarm Reporting Display, 3-86
All RX ATP Test Procedure, 4-6
All tests fail on a single antenna, Troubleshooting,
RFDS, 6-26
All TX ATP Test Procedure, 4-5
All TX/RX ATP Test Procedure, 4-5
Applying AC Power, 2-12
ATP
all inclusive TX acceptance test outline, 4-4
automated introduction, 4-1
code domain noise floor acceptance test procedure,
4-16
code domain power acceptance test procedure, 4-16
failure report generation, 4-20
FER test, frame error rate testing, 4-19
pilot time offset, 4-13
prerequisites, 4-2
spectral purity TX mask, 4-10
test matrix/detailed optimization, B-2
waveform quality (Rho), 4-12
waveform quality (RHO) acceptance test procedure,
4-12
Attenuator, required test equipment, 1-9
B
Basic Troubleshooting Overview, 6-1
Battery Charge Test (Connected Batteries), 2-15
Battery Discharge Test, 2-16
Bay Level offset calibration failure, 6-10
BBX
carrier spectral purity, 4-9
gain set point vs SIF output considerations, C-1
primary and redundant, TX tests to be performed,
4-7
BBX2 Connector, 6-20
BBX2 LED Status Combinations, 6-33
BDC, pilot gain setting, 4-18
Bringing modules into service, prepare to leave the
site, 5-3
Broad Band Receiver. See BBX
BTS
download, 3-32
Ethernet LAN interconnect diagram, 3-29
LMF connection, 3-15, 3-21
log out of session, 5-4
RX sensitivity/frame error rate, 4-8
system software download, 3-3
when to optimize, B-1